
Building Channel Tunnel
|
Channel Tunnel (Chunnel)
Choose another wonder
Area: Folkestone, England, and Sangatte, France Completion Date: 1994 Price: $21 billion Length: 163, 680 foot (31 miles) Purpose: Railroad Setting: Underwater Products: metal, concrete Engineer(s): Transmanche Connect Engineering Firm When England and France decided to link their particular two nations with a 32-mile rail tunnel beneath the English Channel, engineers had been up against an enormous challenge. Not just would they should develop one of several longest tunnels worldwide; they might need persuade people that guests will be safe in a tunnel this dimensions. Tunnel fires, like Holland Tunnel disaster, had been common currently. Exactly how did the designers resolve this dilemma? They built a getaway path. Simply click picture
The Channel Tunnel, also called the Euro Tunnel or Chunnel, really comprises of three tunnels. Two of tubes are full sized and accommodate rail traffic. Among both train tunnels is an inferior solution tunnel that functions as a crisis escape path. There are also several "cross-over" passages that allow trains to switch from one track to another. Just one year after the Chunnel opened, this engineering design was put to the test. Thirty-one everyone was trapped in a fire that broke out in a train originating from France. The look worked. Everyone was capable escape through the solution tunnel. It took simply three-years for from France and The united kingdomt to chew through chalky earth and satisfy a huge selection of legs below the surface for the English Channel. These days, trains roar through the tunnel at increases to 100 kilometers per hour and it's feasible to obtain from one end to another in mere 20 moments! Here's how this tunnel stacks against some of the longest tunnels on the planet.(total length, in legs)
Fast Facts:
|